300L 500L Stainless Steel Beer Brewery Equipment for Sale
300L 500L Stainless Steel Beer Brewery Equipment for Sale Packaging Details 1.LCL/FCL(20GP/40GP/40HQ). 2.Packed with pla
Basic Info.
Model NO. | MT-500L |
Brewhouse Heating | Steam Jacket,Electric Tube,Direct Fire |
Voltage | 380V,220V |
Electric Elements | up to Ce UL Standard |
Polish Finish | 0.4-0.6um |
Guarantee | 3 Years for Tank |
Insulation | Polyurethane Foam |
After Sales Service | Installation and Equipment Commission |
Material Thickness | Inner Wallet 3mm outer Wallet 2mm |
Technology | Offer Auto CAD and 3D Design Drawing |
Material | Full Stainless Steel SUS304 |
Welding | Arc Argon Protection |
Condition | New |
Transport Package | Plastic Film, Plywood Case; Container; |
Specification | Customized |
Trademark | METO |
Origin | Jinan China |
HS Code | 84384000 |
Production Capacity | 10 Set/Sets Per Month Stainless Steel Brewhouse |
Product Description
2 Vessel Brewhouse | 3 Vessel Brewhouse |
Mash/Lauter tun+Brew kettle/whirlpool tank | 1.Lauter&storage tank+brew kettle/whirlpool tank 2.Lauter&whirlpool tank ,+brew kettle 3.Lauter&HLT +brewkettle/whirlpool tank |
Combined 3 Vessel Brewhouse | 4 Vessel Brewhouse |
1.Mash/lauter tun+ brew kettle +whirlpool tank 2.Mash tun+ lauter tank + brewkettle/whirlpool tank | Mash tun +lauter tank + brew kettle+whirlpool tank |
UNit | Components | Capacity | Specification |
Milling | Miller | 200KG/H | Double Roller,Noise<60db |
Brewhouse | Mash/Lauter tun | 500L | Mashing Process:Decoction.Infusion.Multi-step infusion |
Brew Kettle/Whirlpool Tank | 500L | Heating source:Steam,Electric,direct fire SUS304/Red copper | |
Hot Water Tank | 800L | Heating source:Steam,Electric,Gas | |
Heat exchanger | 5 SQM | Stainless steel plate | |
Fermentation tank | Fermentation Tank (The number according to customer requirements) | 500L or 1000L | Top manway/Side manway Drying hop port to brew IPA Dimple Plate Cooling jacket Carbonation port to fill CO2 |
Yeast Adding Tank | 5-10 L | SUS304 Stainless Steel | |
Cooling System | Glycol Water tank | 1500L | Equiped with PU level indicator |
Chiller | 5Hp | UL/CE certified electric elements,Copeland compressor | |
Pump | 3T/H | ||
Cleaning System | Disinfection Tank | 50-100L | SUS304 full welded |
Alkali Tank | 50-100L | ||
Pump | 3T/H | ||
Control System | Control Cabinet | PID or PLC | |
Optional | Auger System |
Packaging Details
1.LCL/FCL(20GP/40GP/40HQ).
2.Packed with plastic film in fumigation free wooden case or fixed with iron frame.
3.Up to export standard, suitable for delivery.
4.Customer's requirements available.
1. Free consultation service before, during, and after sales Layout plan in 3D or CAD drawings of your brewery;
2. Professional engineers going abroad for the installation ,debugging, and training, all the travelling cost and locate food, and hotel shall be afforded by the buyer
3. The installation period is about 15 days including assembling brewing tanks and training the operator. It is free of charge within 15 days. The buyer will be charged USD 50 per day for each engineer for the extended installation.
4. Round the clock assistance via phone, e-mail, Skype, Whatsapp, MSN, or any other communication method available to the customer.
5. Assisting purchased Facilities by seller including bottling system, steam boiler, water treatment, etc. should be installed separately. If needed, cost calculate additionally.
6. Brewing technology, brewing formula, can be offered available
7. More spare parts are available to offered freely.
Send to us